• Home
  • SERVICES
  • PROJECTS
  • ABOUT US
  • CONTACT US
  • More
    • Home
    • SERVICES
    • PROJECTS
    • ABOUT US
    • CONTACT US
  • Home
  • SERVICES
  • PROJECTS
  • ABOUT US
  • CONTACT US

PROJECTS

iPDS : Engineered Demolition for critical premises

IWBDC TECH LLP provided technical consulting for a critical internal demolition project, ensuring seamless operations, protection of manufactured parts, and precise scheduling post-monsoon.


PLANNING & ASSESSMENT:

  • Structural Analysis: Conducted detailed structural analysis to understand the building’s design and material load distribution.
  • Hazard Identification Risk Assessment: Identified potential hazards, including electrical risks and structural instability.
  • Scheduling: Prepared a comprehensive demolition plan with safety protocols and equipment specifications.
  • Execution Techniques:
  • Utilized selective demolition for targeted removal of specific parts.
  • Implemented mechanical tools, including hydraulic crushers, for efficiency.
  • Sustainability and Safety:
  • Managed waste by sorting and recycling materials.
  • Controlled noise and dust using advanced suppression techniques.
  • Established strict safety measures, including exclusion zones and continuous monitoring.

KEY ACHIEVEMENTS:

  • 10% in cost saving due to value engineering. 
  • Project executed within 30 days with zero safety hazard

iPDS for Greenfield project:

IWBCS TECH LLP provided cost-saving solutions for a greenfield industrial project for an automobile parts manufacturer. Our efforts included:

  • Identifying Design Inefficiencies: The initial structural design was overly heavy, and the space planning by the architect was not adequately aligned with operational needs.
  • User Requirement Study: Conducted a detailed analysis of the client’s specific operational needs, workflows, and equipment requirements to better understand the project’s functional demands.
  • Design Review: Thoroughly reviewed the architectural and structural designs to identify areas of inefficiency and opportunities for optimization.
  • Optimized Plant Layout: Redesigned the plant layout to improve space planning, ensuring a more functional and efficient workspace aligned with production workflows.
  • Structural Redesign: Simplified the structural design by reducing unnecessary elements, while still maintaining safety and functionality, resulting in material and cost savings.
  • Capital Cost Savings: Our combined design adjustments resulted in a 25% reduction in the overall capital cost of the project, enhancing the project’s budget efficiency without compromising on quality or operational needs.

KEY ACHIEVEMENTS:

  • 60 Lac saving in estimated project cost of 3.00 Cr with value engineering and rectification of design and deliverables. 

Cost Consulting: Office area Refurbishments:

IWBDC TECH LLP provided solutions for the refurbishment of a company's reception area, CMD cabins, and restrooms. The differentiator effects:

  • Benchmarking of Rates: Conducted thorough research to provide accurate cost comparisons.
  • Cost-effective Solutions: Provided design solutions to avoid demolition in multiple areas and alternative material suggestions that would result in significant time, cost savings. and ensure long term functionality.
  • Vendor Evaluation: Assisted in evaluating potential vendors to ensure the selection of reliable and competitive suppliers.

KEY ACHIEVEMENTS:

  • 30% saving due to benchmarking and vendor evaluation.

Copyright © 2024 IWB D&C - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. 

Accept